Dec 17, 2019 | Uncategorized
Metal roof has been ordered and is scheduled to arrive in two weeks Louvers have been approved and ordered Photos below show preparation of roof for primer *Note: Please be mindful of the barricades on each end of the walking trail around the Wellness Center. This...
Dec 9, 2019 | Uncategorized
Crews began building a deck for scaffolding inside the pool area. Carpet was laid before building the deck. Photos are being taken of any preexisting problems on the deck and pool. Portable toilets to be delivered 12/10/19. Plan is to begin with surface prep...