Kahite Construction Updates: 6/11/19

The latest: The electrical rough continues. Insulation will be installed next week. Sheetrock will follow insulation. Painting will follow the sheetrock. EIFS process: foam has been attached to the Densglass. The windows and glass are in...

Toqua Construction Updates: 6/11/19

The latest: Plywood on the roof is complete. The metal roof is scheduled to be installed in about three weeks. The fire sprinkler system is being installed. HVAC contractor is onsite. Electrical rough-in is underway. The kitchen hood has been installed. Framing...