• Crews began building a deck for scaffolding inside the pool area.
  • Carpet was laid before building the deck.
  • Photos are being taken of any preexisting problems on the deck and pool.
  • Portable toilets to be delivered 12/10/19.
  • Plan is to begin with surface prep for the painting by 12/11/19.
  • Construction fencing to be installed 12/16/19.